Samoa Apia Urban Road Lighting Upgrade Project
GERITEL
Apr 07,2026
In the first quarter of 2022, we partnered with the Apia Municipal Government in Samoa to deliver a critical urban road lighting upgrade project, covering the main arterial roads of Apia, the country’s capital. As a key supplier of electrical cables for this project, we successfully solved the client’s core pain points with our certified, high-quality, and cost-effective cable solutions, including Multicore Flexible Cable, Elastomer Cable, and Earthing Cable. This case study details how our expertise and products supported the smooth completion of Apia’s urban lighting modernization, highlighting why we are the trusted choice for low-voltage cable exports to the Pacific region.
1. Apia’s Lighting Dilemma and the Need for Reliable Cable Solutions
Apia, the largest city and economic center of Samoa, is home to over 40,000 residents and serves as a key hub for tourism and commerce. By early 2022, the city’s existing road lighting system had become outdated, with aging cables leading to frequent power outages, poor lighting brightness, and significant safety hazards for pedestrians and motorists. The municipal government launched a comprehensive lighting upgrade project, aiming to replace old fixtures and cables with energy-efficient, durable solutions that could withstand Samoa’s tropical marine climate—characterized by high humidity, frequent rainfall, and occasional strong winds.
The client’s core challenges were clear. First, they needed cables that could meet Samoa’s strict electrical safety standards, which align with Australian regulations, requiring SAA certification (Standards Australia Approvals) for all electrical products used in public infrastructure. Second, the project budget was limited, so cost-effectiveness was a top priority without compromising quality. Third, the cables had to be durable enough to resist corrosion, moisture, and mechanical wear, as they would be installed outdoors along busy roads and in exposed areas. Finally, the client needed a supplier that could deliver the required cables on time to avoid delaying the project, which was scheduled to be completed before the start of Samoa’s peak tourism season in mid-2022.
After evaluating several international suppliers, the Apia Municipal Government chose us for one key reason: we were the only supplier that could provide SAA-certified cables at a competitive price, with a proven track record of delivering reliable products for outdoor infrastructure projects. Our ability to customize cable specifications to meet the project’s unique needs further solidified their decision.
2. Choosing the Right Cables for Apia’s Unique Needs
After detailed discussions with the client and on-site assessments of Apia’s road conditions, we recommended a suite of cables tailored to the project’s requirements, all of which fall under the category oflow voltage cable (operating at 450/750V, compliant with AS/NZS 5000.2 standards) to ensure safety and energy efficiency. Each cable type was selected for its unique advantages, addressing specific pain points the client faced.
2. 1 Multicore Flexible Cable: For Easy Installation and Versatility
We supplied Multicore Flexible Cable (model: YFFB 4×1.5mm², 4×2.5mm², and 6×4mm²) for connecting lighting fixtures to power distribution boxes. Unlike single-core cables, which are rigid and difficult to install in tight spaces, our multicore flexible cables feature a stranded copper conductor and PVC insulation, allowing for easy bending and routing around road curbs, utility poles, and other obstacles. This flexibility significantly reduced installation time and labor costs— a key advantage for the client, who needed the project completed quickly.
The multicore design also eliminated the need for multiple single-core cables, reducing clutter and minimizing the risk of short circuits. Compared to traditional rigid cables, our Multicore Flexible Cable is more resistant to mechanical damage, making it ideal for outdoor use where cables may be exposed to accidental impact from construction equipment or traffic.
2. 2 Elastomer Cable: For Extreme Weather Resistance
Given Samoa’s tropical marine climate, we recommended Elastomer Cable (model: H05RN-F 3×2.5mm² and 3×4mm²) for areas exposed to direct sunlight, rain, and high humidity. Elastomer cables, made from TPE (thermoplastic elastomer) insulation and sheath, offer superior resistance to moisture, UV radiation, and temperature fluctuations compared to standard PVC cables. They remain flexible even in low temperatures (down to -20°C) and do not crack or degrade under prolonged sun exposure— a critical feature in Apia, where temperatures often exceed 30°C and UV radiation is intense.
Unlike rubber cables, which are prone to aging and cracking over time, our Elastomer Cable combines the flexibility of rubber with the durability of thermoplastics, ensuring a long service life of at least 15 years. This eliminated the client’s concern about frequent cable replacements, which would have increased maintenance costs and disrupted the lighting system.

2. 3 Earthing Cable: For Maximum Safety Compliance
Safety was a top priority for the client, so we supplied Earthing Cable (model: yellow-green dual-color 16mm² and 25mm², copper conductor) to ensure proper grounding of the lighting system. According to AS/NZS 3000 standards, earthing cables must be sized to match the main conductors to effectively dissipate fault currents and prevent electric shock hazards. Our Earthing Cable features a tinned copper conductor for corrosion resistance and a PVC sheath that is flame-retardant, further enhancing safety.
Compared to uncertified earthing cables on the market, our product undergoes strict quality control to ensure consistent conductivity and durability. This was crucial for the client, as improper grounding could lead to electrical faults, endangering public safety and resulting in non-compliance with local regulations.
3. SAA Certification and Strict Quality Control
The client’s most critical requirement was compliance with Samoan electrical standards, which are aligned with Australian AS/NZS standards. All our cables— including the Multicore Flexible Cable, Elastomer Cable, Earthing Cable, and the low voltage cable range— hold full SAA certification, issued by a NATA-accredited laboratory. This certification ensures that our products meet the highest safety and performance standards, including flame retardancy, insulation integrity, and low smoke emission.

Beyond SAA certification, we implement strict quality control throughout the production process. Each batch of cables is tested for electrical conductivity, insulation resistance, and mechanical strength before leaving our factory. For the Apia project, we conducted additional tests to verify resistance to humidity and UV radiation, ensuring the cables could withstand Samoa’s harsh climate. We also provided detailed technical documents, including test reports and installation guidelines, to help the client’s team ensure proper installation and compliance.
4. On-Time, On-Budget, and Hassle-Free
The client emphasized the importance of on-time delivery, as delays would have pushed the project beyond the peak tourism season. We worked closely with the client to finalize the order: a total of 8,500 meters of Multicore Flexible Cable, 6,200 meters of Elastomer Cable, and 3,800 meters of Earthing Cable. Our production team prioritized the order, completing manufacturing within 15 days— faster than the client’s 20-day deadline.
We arranged for sea freight to Apia’s port, handling all customs clearance and documentation to avoid delays. Our logistics team tracked the shipment in real time, providing the client with regular updates. The cables arrived in Apia 28 days after production, allowing the installation team to start work immediately. We also sent a technical consultant to Apia to provide on-site guidance, ensuring the cables were installed correctly and efficiently. This hands-on support eliminated the client’s concerns about installation errors and helped keep the project on schedule.
5. Safer, More Efficient Lighting for Apia
The Apia road lighting upgrade project was completed in June 2022, ahead of the peak tourism season, and the results exceeded the client’s expectations. The new lighting system, powered by our SAA-certified cables, provides consistent, bright illumination along Apia’s main roads, reducing traffic accidents by 35% in the first three months of operation. The cables have performed flawlessly in Samoa’s tropical climate, with no power outages or cable failures reported.
The client also benefited from significant cost savings. Our cables were 15-20% more affordable than those offered by other international suppliers, without compromising quality or certification. The durability of our Elastomer Cable and Multicore Flexible Cable has reduced maintenance costs, as the client no longer needs to replace aging or damaged cables annually. Additionally, the energy efficiency of the low voltage cable range has helped lower the project’s long-term energy consumption.
6. Cooperation Value and Client Feedback
Our partnership with the Apia Municipal Government was built on trust, reliability, and a commitment to solving their unique challenges. The client valued our ability to provide SAA-certified cables at a competitive price, as well as our proactive communication and on-site support. They recognized that our cables were not just a cost-effective solution, but a long-term investment in Apia’s urban infrastructure.
The client noted that our attention to detail— from customizing cable specifications to ensuring on-time delivery— set us apart from other suppliers. They also highlighted the quality of our products, noting that the cables’ durability and performance had exceeded their expectations. As a result, the Apia Municipal Government has expressed interest in partnering with us for future infrastructure projects, including the expansion of the lighting system to suburban areas of Apia.
7. Choose Us for Your Low Voltage Cable Needs: Reliable, Certified, and Cost-Effective
The Samoa Apia road lighting upgrade project is a testament to our ability to deliver high-quality, certified cable solutions for international infrastructure projects. Whether you are working on urban lighting, commercial buildings, or industrial facilities, we have the expertise and products to meet your needs. Our SAA-certified Multicore Flexible Cable, Elastomer Cable, Earthing Cable, and low voltage cable range are designed to withstand harsh environments, ensure safety compliance, and deliver long-term value.
We pride ourselves on offering competitive prices without compromising quality, and our commitment to on-time delivery and exceptional customer service ensures a hassle-free experience for our clients. If you are looking for a trusted partner for your cable export needs, contact us today to discuss your project requirements and get a customized quote.
Contact Us
Dongguan GERITEL Electrical Co., Ltd.
Tel/WhatsApp/WeChat: +86 135 1078 4550 / +86 136 6257 9592
Email: manager01@greaterwire.com
Home
Solomon National Broadband Infrastructure Project









Building 2, No. 40 Luxi 2nd Road, Liaobu Town, Dongguan City, Guangdong Province, China